Start with a complete door schedule

List every opening, room, wall thickness, clear size, opening direction and hardware requirement before choosing finishes. This prevents attractive reference images from hiding basic coordination problems.

For a villa or large residence, the schedule should also identify the entrance hierarchy, service spaces, concealed doors and any openings that need special installation conditions.

Create a shared design language, not identical doors

A coordinated package can share color temperature, metal finish, proportions and handle language without forcing the same construction into every room.

Entrance and interior doors may use different structures and materials while still reading as one architectural system.

Approve materials and one representative sample

Confirm finish samples under the intended light and record approved references before batch production. Complex projects should approve a representative sample door, including frame, leaf, hardware and wall junction.

PAFDOOR uses drawings, finish samples and door schedules to coordinate the package before production planning.